Resources & Feedstock

Hundreds of millions of tonnes, already above ground.

Resource
Ready to Recover

Decades of coal-fired generation left large, well-defined ash deposits at power stations across the UK and Spain. We estimate the total PFA resource in the two countries at 250-425 million tonnes. Because the ash is already mined, burned and ground to a fine powder, there is no extraction, crushing or milling cost before processing.

Sites
Reviewed

We have reviewed 18 former and current coal-fired stations, holding an estimated 200-300 million tonnes of PFA.

Power stationLocationCapacity (MW)Est. PFA resource (Mt)
DraxNorth Yorkshire, England4,00035-45
LongannetFife, Scotland2,40022-32
Ferrybridge CWest Yorkshire, England2,00020-30
EggboroughNorth Yorkshire, England2,00020-30
West Burton ANottinghamshire, England2,00018-28
CottamNottinghamshire, England2,00015-25
Fiddlers FerryCheshire, England2,00015-25
Aberthaw BVale of Glamorgan, Wales1,50010-18
Litoral de Almería 2Almería, Spain1,1208-16
Compostilla IILeón, Spain1,0058-15
Aboño 2Asturias, Spain8785-12
La Robla 2León, Spain6194-9
Alcúdia 1Mallorca, Spain5343-8
Los BarriosCádiz, Spain5703-7
MeiramaA Coruña, Spain5573-7
Narcea 3Asturias, Spain5543-7
Guardo 2Palencia, Spain4863-7
KilrootCounty Antrim, Northern Ireland5003-6

Typical
Feedstock Composition

ComponentShare of ashReactive share
Silica45.0%---
Alumina23.0%51%
Carbon (loss on ignition)15.0%---
Hematite (iron oxide)6.5%14%
Potassium oxide2.3%5.1%
Calcium oxide1.9%4.2%
Magnesium oxide1.2%2.7%
Titanium and sodium oxides1.4%---

How We
Select Sites

Scale: enough tonnage to feed a 1 million tonne-a-year plant for 20 years or more.

Grade: alumina, carbon and critical-mineral content, confirmed by sampling.

Logistics: rail, road and port access for reagents and products.

Planning: a clear route to the necessary permits for recovery and site restoration.

Industrial fit: proximity to processing clusters, such as the Humber and Northeast England.

Owner alignment: landowners who want the liability cleared and the land restored.

Target Sites and
and Partnerships

We are seeking Critical Minerals Accelerator support to take the process from laboratory to pilot scale on this feedstock.

For
Landowners

If you own or manage a PFA lagoon, landfill or stockpile, we can turn a long-term liability into a revenue-generating resource and help restore the land. Talk to us about your site.